For San Antonio and Bexar County property improvements

Worried about work without permits? Find the facts before choosing a fix.

Confirm which office was responsible, search the complete record, compare it with the work, and ask what is required now.

Free No account or contact information Private on this device
Who made this site?

Bexar County Home Buyers, a private home-buying company. The tools are free and do not send us your answers. Discussing a possible purchase is a separate choice.

Do the right work in a clear order.

01

Confirm the location

San Antonio, another city, and unincorporated Bexar County can have different authorities and rules.

02

Describe the work plainly

Write what changed physically without first labeling it legal, illegal, safe, or unsafe.

03

Search every record lane

Check address variants, building records, trade permits, plans, inspections, corrections, and final status.

04

Match paper to house

Compare the approved scope, dates, plans, and inspections with what actually exists.

05

Check physical condition

Permit status and present safety are separate questions; qualified review may be needed for both.

06

Get the next step in writing

Ask the responsible office what records, plans, tests, corrections, and inspections apply now.

Free tool

Find the record before choosing a repair.

“Unpermitted” is not a conclusion until you confirm the location, work date, scope, record, and inspections.

01Where was the property when the work was done?
02What work are you concerned about?
03What did the official search show?
04What decision or date is approaching?

One thing at a time.

Research

What to do

  • Confirm the authority responsible when the work occurred.
  • Search every address form and related trade record.
  • Save complete results, numbers, scope, and inspection history.
Compare

What to do

  • Photograph the work safely and gather plans, invoices, and contractor details.
  • Match the official scope to the physical work.
  • List what is found, missing, open, final, or different.
Resolve

What to do

  • Ask the office for the current correction or close-out path.
  • Use qualified designers, contractors, trades, or engineers as required.
  • Compare documenting, correcting, removing, or selling with verified facts.

Safety comes first.

Call 911 for immediate danger. Do not expose, energize, test, disturb, or cover questionable electrical, gas, structural, sewer, fire, pool, excavation, mold, asbestos, or lead-related work. Use appropriately qualified professionals.

Clear answers to get started.

Confirm dates, rights, and requirements with the responsible agency or qualified professional.

Does no search result prove there was no permit?

No. Address formats, old systems, separate trade records, and jurisdiction boundaries can matter. Ask the responsible office how to confirm.

Does a permit prove the work is safe now?

No. Permit history and current physical condition are separate evidence questions.

Should I open walls or remove the work?

Not from generic guidance. Doing so can create safety, structural, utility, environmental, tenant, insurance, and evidence problems.

Can the house still be sold?

A sale may be possible, but uncertainty can affect disclosure, inspection, insurance, lending, price, and contract terms. Do not make unsupported claims.

What if the house is outside San Antonio?

Confirm the correct city or unincorporated-county authority and the work date before using forms or rules.

Find the record. Match the work. Ask for the responsible path.

Use the free tool first. If you later want to discuss selling the property in its current condition, that conversation is optional and separate.